At the time of installation, a elevator base is installed at 1 m per interval.
As shown in the figure below:
Each hanger can be up to 600N.
It's about 4.8 N per meter in full water,
600N>>>>>>4.8N。
Ensure the quality of the products is stable while ensuring the speed of installation.